The verified record of every facility you run.
Robotic Imaging scans production floors, warehouses and site exteriors around operating shifts and delivers as-built drawings, a BIM model, the point cloud, a 360 virtual tour, an asset register and area takeoffs, so retrofits, expansions and maintenance start from the facility as built.
- Technician dispatch
- 2 to 3 days
- Raw data after visit
- 24 hrs
- Trusted by
- Amazon
What does one industrial facility scan deliver?
Six deliverables from one registered scan. Every file below comes from the same site visit.
As-built drawingsDWG · PDF
Floor plans, sections and elevations of the facility as it exists, so retrofit and expansion design starts from a verified base.
Used byArchitects · Engineers
BIM modelRVT · IFC
A Revit model of structure, process equipment and visible MEP, built from the registered scan for retrofit and expansion design.
Used byDesign · Construction
Point cloudRCP · E57
Structure, racking, conveyors and pipe runs on file. When someone needs a clearance nobody drew, it is already captured.
Used byEngineers · Integrators
360 virtual tourWeb link
Engineering, ops and vendors walk the facility from a desk, with fewer site visits.
Used byOps · Vendors · GCs
Asset registerCSV · API
A structured row for every equipment item, panel and RTU (make, model, serial, location) loaded into the CMMS you already run.
Used byMaintenance · FM systems
Area takeoffsXLSX · PDF
Production, storage and office areas computed from the as-built, so capacity and space planning use measured figures.
Used byReal estate · Planning
How does capture fit around industrial operations?
Lines keep running
Capture around shifts. No shutdowns.
Clearances measured
Structure, racking and pipe runs measured as built.
One standard, every plant
Same deliverable set across sites.
Feeds your systems
Equipment and plans pushed to your CMMS via API.
What does a fulfillment center capture look like?
Amazon · Fulfillment center
Captured while the building stayed in operation
Sortation floor, mezzanine, conveyors and racking captured while the building stayed in operation, registered into one point cloud.
One registered point cloud
The whole floor, mezzanine and conveyor system in one dataset for engineering and integrators.
- Point cloud
- BIM model
- As-built drawings
- 360 virtual tour
Industrial capture FAQ
Do production lines have to stop for a scan?
No. Capture is scheduled around shifts, with no shutdowns, so lines keep running.
What does an industrial scan measure?
Structure, racking, conveyors, pipe runs and visible MEP, registered into one point cloud and modeled in Revit.
What file formats do industrial deliverables come in?
Drawings in DWG and PDF, BIM models in RVT and IFC, point clouds in RCP and E57, asset data in CSV or by API, and 360 tours by web link.
How are multi-site programs handled?
Every plant gets the same deliverable set. A certified technician is dispatched in two to three days, and raw data is available within 24 hours.
Start with what is really there.
Tell us one location. A certified technician is dispatched in two to three days and you have raw spatial data inside 24 hours.