PHASE 1: Design: This phase establishes the foundation for the entire project. It includes detailed engineering reviews, environmental due diligence, and site selection to ensure the design is strong and compliant before construction begins.
PHASE 2: Build: The construction phase focuses on executing the design accurately. On-site validation, such as materials testing, enclosure verification, and nondestructive examination (NDE), helps maintain quality and keep the schedule on track.
PHASE 3: Commission: The final step before go-live. Commissioning confirms that all critical systems, electrical, mechanical, and ICT systems perform as intended under full load, ensuring the facility is ready for continuous operation.